Brandy Place

Summary of Work for Roof Replacement.

  • Remove Existing HVAC units/Heat pumps and Condensate drains (to perform work and store on site)
  • Remove existing Foam & Torch down to roof deck and flashing associated with removal of roof system 
  • Supply and Install Holcim ELEVATE 60 ML TPO Roofing System 
  • Provide and install 1” ISO board, fasteners, TPO roof jacks and Termination bars
  • Provide & Install Galvanized Flashing for Parapet wall
  • Re-Install existing HVAC units, connect and start all units for proper operation

Before

no images were found

During

After

no images were found

Structural Repairs

no images were found

Stucco Repairs