Brandy Place

Summary of Work for Roof Replacement.

  • Remove Existing HVAC units/Heat pumps and Condensate drains (to perform work and store on site)
  • Remove existing Foam & Torch down to roof deck and flashing associated with removal of roof system 
  • Supply and Install Holcim ELEVATE 60 ML TPO Roofing System 
  • Provide and install 1” ISO board, fasteners, TPO roof jacks and Termination bars
  • Provide & Install Galvanized Flashing for Parapet wall
  • Re-Install existing HVAC units, connect and start all units for proper operation

Before